Service area: Available in California, Nevada, Arizona, Oregon, Washington, Idaho, Montana, Utah, Wyoming, Colorado, New Mexico, North Dakota, South Dakota, Texas, Oklahoma, Louisiana, Nebraska, Alabama, Arkansas, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, New Hampshire, New Jersey, New York, North Carolina, Ohio, Pennsylvania, Rhode Island, South Carolina, Tennessee, Vermont, Virginia, West Virginia and Wisconsin.
A facility that discharges process wastewater to a municipal sewer is an industrial user, and its obligations come from the local treatment plant’s pretreatment program under 40 CFR Part 403: the discharge permit, the sampling schedule, local limits and, for many users, a slug discharge control plan. McNeil Safety Consulting prepares that compliance work and protects the people who work around wastewater.
Industrial pretreatment compliance
- Slug discharge control plans under 40 CFR §403.8(f)(2)(vi): discharge practices including batch discharges, stored chemicals, immediate notification procedures with written follow-up within five days, and spill-prevention measures.
- Monitoring and sampling plans, and review of self-monitoring data against permit limits.
- Support preparing the industrial user permit application to the local sewer authority.
- Discharge compliance audits: what the facility actually sends to the sewer, checked against its permit, reporting duties and slug-control plan.
Treatment-plant and collection-system worker safety
- Hydrogen sulfide exposure assessment and monitoring programs.
- Permit-required confined space programs for wet wells, digesters, vaults and manholes.
- Chlorine and treatment-chemical hazard programs, including process safety where thresholds are met.
- Biological exposure controls and industrial hygiene sampling for plant and collection crews.
What is outside our scope
Treatment system design and engineering reports that require a professional engineer’s seal are outside our scope. SPCC plans are prepared only for facilities that qualify to self-certify under 40 CFR §112.6.
Frequently asked questions
Who decides whether we need a slug discharge control plan?
The control authority, usually the local treatment plant. Under 40 CFR §403.8(f)(2)(vi) it evaluates each significant industrial user and can require a plan. If yours has, we write it to the elements the regulation lists.
Does a slug control plan need an engineer’s stamp?
Federal pretreatment rules do not require one; check your control authority’s permit conditions. Design of treatment equipment is engineering and is outside our scope.
Do you work outside California?
Yes. We work across the lower 48 states; the permit program and control authority differ by state and are identified at the start of every engagement.
Call (626) 546-9384 or email mike@mcneilsafetyconsulting.com to request a consultation. See also the 48 states we serve and all services.
States We Serve
McNeil Safety Consulting provides this service to clients in the following states:
- California
- Nevada
- Arizona
- Oregon
- Washington
- Idaho
- Montana
- Utah
- Wyoming
- Colorado
- New Mexico
- North Dakota
- South Dakota
- Texas
- Oklahoma
- Louisiana
- Nebraska
- Alabama
- Arkansas
- Connecticut
- Delaware
- Florida
- Georgia
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- New Hampshire
- New Jersey
- New York
- North Carolina
- Ohio
- Pennsylvania
- Rhode Island
- South Carolina
- Tennessee
- Vermont
- Virginia
- West Virginia
- Wisconsin
To confirm coverage for your site, call (626) 546-9384.