Safe Patient Handling in California Hospitals: Cal/OSHA Section 5120

By Michael Karl McNeil, REP, RIH, EPP, QSD

Nurses and nursing assistants are injured lifting and moving patients at rates that rival construction and warehousing. The reason is simple arithmetic. An adult patient who cannot assist can weigh two hundred pounds or more, the lift happens at the bedside with poor footing and an awkward reach, and it happens many times per shift. No technique training makes that load safe for the human spine.

California addressed this with Labor Code §6403.5 and the regulation that implements it, 8 CCR §5120, Health Care Worker Back and Musculoskeletal Injury Prevention, operative October 1, 2014. The core idea is in the definition of a safe patient handling policy: manual lifting and transferring of patients is to be replaced with powered transfer devices, lifting devices and lift teams, as appropriate for the specific patient and consistent with the professional judgment and clinical assessment of the registered nurse.

Which facilities are covered

Subsection (a) applies the section to all general acute care hospitals licensed by the California Department of Public Health. Hospitals operated by the Department of Corrections and Rehabilitation and the State Department of Developmental Services are excepted, as are units separately licensed as a distinct part under Title 22 sections 70625 and 70627.

Skilled nursing facilities, home health agencies, outpatient clinics and hospices are not covered by §5120. That does not leave them unregulated. The note to subsection (a) states that §3203 (the IIPP) and other Title 8 orders, including the repetitive motion standard in §5110, still apply to patient handling everywhere else. A skilled nursing facility with a pattern of lifting injuries can be cited under its IIPP for failing to identify and correct the hazard.

The written plan

Subsection (c) requires each covered hospital to establish, implement and maintain an effective written Patient Protection and Health Care Worker Back and Musculoskeletal Injury Prevention Plan as part of its IIPP. The plan must be in effect for all patient care units, and the portion applicable to each unit must be available to employees on that unit at all times. “Patient care unit” is defined broadly and expressly includes diagnostic imaging, the emergency department, rehabilitation and behavioral health, not only nursing floors.

The plan has eleven required elements. The ones that drive most of the work are these:

Equipment needs by unit. Subsection (c)(5)(A) requires a procedure to determine the types, quantities and locations of powered and other patient handling equipment for each unit, including where permanent and portable equipment should be placed so it is available and accessible at all times. A ceiling lift in two rooms of a thirty-bed unit, with a single portable lift stored on another floor, does not meet that test when a patient needs a lift at 3 a.m.

The designated registered nurse. Subsection (c)(5)(B) makes the designated registered nurse the coordinator of care for patient handling. The nurse assesses each patient’s mobility needs using assessment tools, decision trees, algorithms or other effective means, and prepares a safe patient handling instruction for that patient. Under (c)(7)(C), the nurse observes and directs patient lifts and mobilizations, consistent with Labor Code §6403.5 and Title 22 §70215.

Lift team or designated worker availability. Subsection (c)(7)(E) requires procedures to make lift teams or other designated health care workers available to perform lifts in each patient care unit at all times. The regulation closes the obvious loophole: an employee is not “available” if other assignments prevent that person from participating in the lift within the time frame the directing nurse determines is necessary.

Other employers. Subsection (c)(3) requires the plan to address employees of other employers who work on patient care units, such as registry nurses, travelers and contract therapy staff, including the training they need and how their injuries are investigated and recorded.

Evaluation and review. The equipment and procedures must be evaluated when the plan is established, when equipment or conditions change, when a new hazard is recognized, and at least annually for each unit (c)(5)(C). The whole plan must be reviewed at least annually for each unit under (c)(11), including injury data and trends, with active involvement of employees.

The right to refuse

The training requirements in subsection (d)(2)(H) include the right to refuse to lift, reposition, mobilize or transfer a patient due to concerns about patient or worker safety or the lack of trained personnel or equipment. Supervisors must be trained under (d)(2)(M) on the hospital’s policy that a health care worker may not be disciplined for that refusal. Labor Code §6403.5 is the source of that protection.

In practice, this is where hospital programs fail under pressure. A unit is short-staffed, the lift team is tied up in the emergency department, and a charge nurse tells two aides to move a patient manually. The aides comply because the patient needs to be moved. If one of them is injured, the investigation under (c)(6) will ask whether sufficient staff and equipment were available and whether the plan was implemented. The answer, documented in the hospital’s own records, is often no.

Training

Subsection (d) requires training for every employee whose assignment includes being present on patient care units. The content scales with the role:

  • Designated health care workers, lift team members, designated registered nurses and their supervisors receive initial training covering fourteen listed elements, including practice with the specific types and models of equipment they will use, and refresher training at least every twelve months that includes practice performing multi-person manual tasks.
  • Designated registered nurses also receive training in assessing patient mobility needs and communicating instructions.
  • Everyone else who works on a patient care unit, such as dietary, environmental services and transport staff, receives awareness training on recognizing when a designated worker or lift team is needed and how to get one.

Training materials must match the educational level, literacy and language of the employees.

Records

Subsection (e) requires records of the equipment evaluation, selection and placement, of the availability of equipment on each unit, of periodic inspections of procedures, and of injury investigations. Training records must be kept for at least one year and include the dates, content, the equipment models practiced on, the trainers’ names and qualifications, and the attendees’ names and job titles. Injury investigation records must not include medical information as defined in Civil Code §56.05.

What a Cal/OSHA inspector looks for

Inspections usually follow a complaint or an injury report. The inspector will want the plan for the specific unit, the unit’s equipment evaluation, the equipment inventory and where it is stored, the lift team staffing schedule for the shift in question, the patient’s safe patient handling instruction, and the training records of everyone involved. Gaps between the plan and the floor are what get cited: a plan that says lifts are available on every unit while the inventory shows otherwise, an instruction that called for a mechanical lift while the lift was out for repair with no replacement procedure, or a refresher training record that is eighteen months old.

Frequently asked questions

Does §5120 require a dedicated lift team?

No. It requires lift teams and/or other designated health care workers to be available at all times. A hospital can meet the standard with trained unit staff, provided they are actually available within the time frame the directing nurse sets.

Does it apply to the emergency department and imaging?

Yes. Both are listed in the definition of patient care unit.

Our skilled nursing facility is not covered. Do we need anything?

Yes. Your IIPP must identify and correct patient handling hazards, and §5110 may apply where repetitive motion injuries have been diagnosed.

How McNeil Safety Consulting helps

McNeil Safety Consulting evaluates patient handling programs unit by unit, reconciles the written plan with equipment, staffing and training records, and writes or revises §5120 plans and IIPP patient handling components for hospitals and skilled nursing facilities. The practice includes a licensed vocational nurse who supports occupational health work. See healthcare safety programs, or call (626) 546-9384 to request a consultation.

Need help with a Cal/OSHA matter?

McNeil Safety Consulting provides Cal/OSHA citation defense, industrial hygiene, safety plan writing, and expert witness services throughout California. Call (626) 546-9384 or request a consultation.