Service area: Available in California, Nevada, Arizona, Oregon, Washington, Idaho, Montana, Utah, Wyoming, Colorado, New Mexico, North Dakota, South Dakota, Texas, Oklahoma, Louisiana, Nebraska, Alabama, Arkansas, Connecticut, Delaware, Florida, Georgia, Illinois, Indiana, Iowa, Kansas, Kentucky, Maine, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Missouri, New Hampshire, New Jersey, New York, North Carolina, Ohio, Pennsylvania, Rhode Island, South Carolina, Tennessee, Vermont, Virginia, West Virginia and Wisconsin.
Most battery energy storage failures are not cell failures. EPRI’s failure-incident analysis (May 2024) attributed 89 percent of classified root causes to balance-of-system components and controls and 11 percent to the cells themselves, and found that 72 percent of failures with a known system age happened during construction, commissioning or the first two years of operation. The risk sits in the integration, the installation and the early operating period — exactly the phase where site safety, commissioning discipline and the emergency plan are decided.
McNeil Safety Consulting works on that phase: construction and commissioning safety, hazard mitigation analysis review, emergency response planning with the fire department, and worker and responder exposure assessment. Michael Karl McNeil brings 25 years in the fire service, ending as a Fire Battalion Chief, together with hazardous materials management and incident command credentials and industrial hygiene registration (RIH, REP, EPP).
The codes that govern a BESS site
- 2025 California Fire Code §1207 (effective 1 January 2026), which references NFPA 855-2023. §1207.2.1 requires commissioning before the system is placed in service. Outside California, International Fire Code §1207 as adopted and amended by the state.
- NFPA 855, Standard for the Installation of Stationary Energy Storage Systems. The 2026 edition makes a hazard mitigation analysis the default requirement and requires the emergency response plan to be developed with the authority having jurisdiction.
- UL 9540 (system safety listing) and UL 9540A (the test method that characterizes thermal runaway propagation and off-gas). The 9540A report is the factual basis for spacing, explosion control and suppression decisions — and is frequently read selectively.
- NFPA 70E and the Title 8 Electrical Safety Orders for energized work, arc flash and DC hazards during installation and maintenance.
California’s 2025–2026 changes
SB 283 (Chapter 407, Statutes of 2025), effective 1 January 2026, requires a battery storage applicant to meet and confer with the local fire department at least 30 days before applying, and requires a pre-operation inspection by the local fire department or the Office of the State Fire Marshal at the applicant’s cost. CPUC General Order 167-C, adopted 13 March 2025, requires maintenance and operation plans, logbooks, and emergency response and emergency action plans submitted to county and local authorities, with the full requirements applying at 50 MW and above.
Both put the fire department inside the project before it energizes. An emergency plan written by the developer and handed to the fire service at the end no longer meets the rule.
What we do on a BESS project
- Site-specific safety plans and IIPP coverage for construction and commissioning crews, including energized DC work and lift operations around enclosures
- Review of the hazard mitigation analysis against the UL 9540A data it relies on
- Emergency response plans written for the responding fire department, with pre-incident plan content, shutdown and isolation procedures, and off-gas and deflagration hazards stated plainly
- Responder and worker exposure assessment for hydrogen fluoride, carbon monoxide, hydrogen and combustion products
- Gas detection, ventilation and explosion-control review
- Commissioning safety review and pre-energization walkdowns
- Training for site staff and for local responders
Hydrogen fluoride is the exposure plans most often understate
Lithium-ion cells in thermal runaway release hydrogen fluoride from the electrolyte and binder. The ACGIH TLV is a 2 ppm ceiling with a skin notation; the NIOSH REL is a 6 ppm 15-minute ceiling. Standard integrated sampling — NIOSH Method 7906 — collects over a period far longer than a venting event, so a short, high exposure can average down to a result that looks unremarkable. Real-time sensors have cross-sensitivities and recovery times that matter. Plans should say how HF will actually be measured during an event, at re-entry and on surfaces afterward, and who has the instruments.
A BESS Safety Consultant for Developers, EPCs, Owners and Fire Authorities
A BESS safety consultant sits between the battery vendor, the installer, the owner and the authority having jurisdiction, and makes sure the safety case on paper matches what is built and how people will work on it. McNeil Safety Consulting is retained by developers, engineering-procurement-construction contractors, owners and operators, insurers and counsel on utility-scale, commercial and data center storage projects in California and across the Western states.
- Construction and commissioning site safety under Cal/OSHA and federal OSHA, including energized-work and hazardous-energy controls.
- Emergency response plans written to the fire code and coordinated with the responding fire agency.
- Hazardous materials and exposure assessment, including hydrogen fluoride and other combustion and off-gas products.
- Hazard mitigation and safety documentation reviews before permit, commissioning and handover.
- Failure investigation and expert witness work after an event.
The work is done personally by Michael Karl McNeil, REP, RIH, EPP, QSD, a Former Fire Battalion Chief with 25 years in the fire service, which is the experience a fire authority is looking for when it reviews a storage project. After a thermal event, see BESS fire and failure investigation; for oil and gas sites with co-located storage, see oil, gas and BESS safety; for litigation, see OSHA expert witness and litigation support.
Frequently asked questions
Is a UL 9540 listing enough to satisfy the fire code?
No. Listing is one requirement among several. Spacing, explosion control, detection, the hazard mitigation analysis, commissioning and the emergency plan are separate obligations, and the AHJ can require more where the 9540A data supports it.
When should the fire department first see the project?
In California, at least 30 days before the application under SB 283. Practically, during design — the department’s access, water supply and tactical decisions shape the layout.
Do you work on BESS sites outside California?
Yes. Safety, exposure and emergency planning work is accepted across the lower 48 states under the International Fire Code and NFPA 855 as each state has adopted them.
What does a BESS safety consultant do?
A BESS safety consultant reviews the code basis, the hazard mitigation and emergency response documents, the construction and commissioning safety program and the exposure plan for a battery storage project, then closes the gaps before the authority having jurisdiction, the insurer or an incident finds them. The aim is a project that can be permitted, built, commissioned and operated without surprises.
Do you work on BESS projects outside California?
Yes. Safety, industrial hygiene, emergency planning and failure investigation work is taken on across the Western states McNeil Safety Consulting serves, and expert witness work nationwide. The fire code edition and the occupational safety program differ by state, and each project is scoped to the code its jurisdiction has adopted.
Talk to Michael about a project
Every engagement is handled by Michael personally and never subcontracted. Call (626) 546-9384 or request a consultation. When a system has already failed, see BESS fire and failure investigation. Related work: oil, gas and BESS safety, emergency response planning and chemical exposure assessment.
States We Serve
McNeil Safety Consulting provides this service to clients in the following states:
- California
- Nevada
- Arizona
- Oregon
- Washington
- Idaho
- Montana
- Utah
- Wyoming
- Colorado
- New Mexico
- North Dakota
- South Dakota
- Texas
- Oklahoma
- Louisiana
- Nebraska
- Alabama
- Arkansas
- Connecticut
- Delaware
- Florida
- Georgia
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Missouri
- New Hampshire
- New Jersey
- New York
- North Carolina
- Ohio
- Pennsylvania
- Rhode Island
- South Carolina
- Tennessee
- Vermont
- Virginia
- West Virginia
- Wisconsin
To confirm coverage for your site, call (626) 546-9384.