EPC and Utility-Scale Construction Safety

Service area: Available in California, Nevada, Arizona, Oregon, Washington, Idaho, Montana, Utah, Wyoming, Colorado, New Mexico, North Dakota and South Dakota.

McNeil Safety Consulting supports EPC contractors and utility-scale construction projects across California and the Western United States. Call (626) 546-9384.

Scope of Work

  • Site-specific IIPP — written program under 8 CCR §3203 for each project site, not a corporate template.
  • Site-Specific Safety Plan and HASP — task-based hazard analysis, JHAs, permits, and emergency procedures.
  • Multi-employer exposure management — controlling, creating, exposing and correcting employer roles under 8 CCR §336.10.
  • Subcontractor prequalification and audit — program review, training records, competent-person designations.
  • SWPPP preparation and QSD services — Construction General Permit Order WQ 2022-0057-DWQ, SMARTS filing.
  • Industrial hygiene monitoring — silica, welding fume, noise, lead, solvents, heat stress.
  • Incident and near-miss investigation — root cause analysis and corrective action documentation.
  • Cal/OSHA inspection response — opening conference through citation appeal.

Standards That Apply on Utility-Scale Sites

  • Construction Safety Orders — 8 CCR §1500 et seq.; federal counterpart 29 CFR Part 1926.
  • Excavation and trenching — 8 CCR §§1539–1547; permit required under 8 CCR §341 for trenches 5 feet or deeper.
  • Fall protection — 8 CCR §1670; personal fall arrest and guardrail requirements.
  • Confined spaces in construction — 8 CCR §§1950–1962.
  • Cranes and derricks — 8 CCR §4885 et seq.; annual certification and operator qualification.
  • Electrical Safety Orders — 8 CCR §2299 et seq.; arc flash analysis to NFPA 70E.
  • Heat illness prevention — outdoor 8 CCR §3395; indoor 8 CCR §3396.
  • Respirable crystalline silica — 8 CCR §1532.3; PEL 50 µg/m³ as an 8-hour TWA, action level 25 µg/m³.
  • Hazardous materials business plan and CERS filing — Health and Safety Code §25500 et seq. for fuel, solvents and compressed gases stored on site.

Reporting Deadlines

  • Serious injury, illness or death — report to Cal/OSHA immediately, and in no event more than 8 hours after the employer knows or should have known. Labor Code §6409.1(b).
  • Citation appeal — 15 working days from receipt. Labor Code §6600.
  • Non-attorney representation — permitted before the Appeals Board under 8 CCR §378(a).

Project Experience

Utility-scale energy and infrastructure construction in California, Washington, Colorado and New Mexico.

Registrations

Michael Karl McNeil, REP, RIH, EPP, QSD. See Credentials.

Questions

Who is cited when a subcontractor’s employee is exposed?

Cal/OSHA applies the multi-employer worksite rule at 8 CCR §336.10 and may cite the controlling, creating, exposing or correcting employer, or more than one of them, for the same condition.

Does a project SWPPP require a certified preparer?

Yes. The Construction General Permit, Order WQ 2022-0057-DWQ, requires a Qualified SWPPP Developer to prepare and amend the SWPPP and a Qualified SWPPP Practitioner to implement it.

What triggers a site-specific IIPP rather than a company IIPP?

8 CCR §3203 requires the program to address the hazards actually present. On a construction site the hazards change by phase, so the program is written to the site and updated as conditions change.

Contact

McNeil Safety Consulting, 9163 Arcadia Ave, San Gabriel, CA 91775. (626) 546-9384 · mike@mcneilsafetyconsulting.com

States We Serve

McNeil Safety Consulting provides this service to clients in the following states:

  • California
  • Nevada
  • Arizona
  • Oregon
  • Washington
  • Idaho
  • Montana
  • Utah
  • Wyoming
  • Colorado
  • New Mexico
  • North Dakota
  • South Dakota

To confirm coverage for your site, call (626) 546-9384.