Construction Stairways and Ladders: 8 CCR §1629 and §1626

By Michael Karl McNeil, REP, RIH, EPP, QSD

On a building under construction, the way crews get from one level to the next is a safety system in its own right. Cal/OSHA’s Construction Safety Orders do not leave access to the contractor’s preference. Section 1629 says when a stairway is required, how many, how far up it has to reach as the building rises, and when a ladder is an acceptable substitute. Section 1626 then sets the dimensions, railings, and temporary-tread rules for the stairs themselves. Below is what those sections require, read from the current text, and the gaps I find when I walk active sites.

When a Stairway Is Required

The trigger is in 8 CCR §1629, “Stairways and Ladders.” Under §1629(a)(1), buildings or structures two or more stories, or 24 feet or more in height or depth, must be provided with suitable permanent or temporary stairways as set out in subsection (b). The one exception is where unusual site conditions exist: the Division may accept an alternate effective means of access. That is an acceptance by the Division, not a decision the contractor makes alone.

Two smaller rules catch people. Section 1629(a)(2) states that for purposes of the section, scaffolds shall not be considered structures, so a tall scaffold does not by itself trigger the stairway rule. And §1629(a)(3) requires stairways, ramps, or ladders wherever there is a break in elevation of 18 inches or more in a frequently traveled passageway, entry, or exit. That covers the step down from a slab edge into a trench walkway or the drop at a temporary office trailer, not just the main building.

How Many Stairways, and Keeping Them Clear

Section 1629(a)(4) sets the count. One stairway is the minimum for buildings up to three stories or 36 feet, and two or more are required above that, subject to the same unusual-conditions exception. The section adds two conditions:

  • §1629(a)(4)(A). Where only one stairway serves between levels, it must be kept clear to permit free passage of employees.
  • §1629(a)(4)(B). Where there are two or more stairways and work is being done in them, at least one stairway shall be maintained clear for access between levels at all times.

The section carries a note pointing to Article 31 for demolition projects. Stored material can take away that clearance. Drywall, conduit bundles, and trash staged on landings turn the one required stairway into an obstacle course, and that is a straightforward violation of (a)(4)(A).

Three more general rules apply. Stairways must conform to the criteria in Plate B-17 of the Appendix and to Article 17 under §1629(a)(5). Spiral stairways that will not be a permanent part of the structure shall not be used, under §1629(a)(6). And §1629(a)(7) requires at least five foot-candles of light on the steps, with lamps substantially guarded either physically or by location.

The Stairway Has to Keep Up With the Building

Section 1629(b) ties stair construction to the building type.

  • Wood frame, §1629(b)(1). The stairway to a second or higher floor must be completed before studs are raised for the next floor. Cleats shall not be nailed to studs to gain access to the roof or other work areas.
  • Steel frame, §1629(b)(2). Stairways shall extend to the uppermost floor that has been planked or decked. Ladders may be used above that point.
  • Reinforced concrete or composite steel-concrete, §1629(b)(3). Stairways extend to the lowest floor with a complete vertical shoring system in place. Above that, at least two ladders at different locations per floor may be used, for not more than three floors.
  • Roof and attic work, §1629(b)(4). These areas must have a safe means of access and egress by stairways, ramps, or ladders meeting Article 25.

On wood-frame jobs, the schedule pressure is to frame the next floor first and build the stair later. The regulation reverses that order.

Stairway Dimensions and Construction

Article 17 of the Construction Safety Orders is titled “Ramps, Runways, Stairwells, and Stairs,” and §1626 covers stairwells and stairs. Under §1626(a)(1), stairways shall be at least 24 inches wide and equipped with stair rails, handrails, treads, and landings. Section 1626(a)(2) requires railings and toeboards meeting Article 16 around stairwells.

The construction requirements in §1626(b) include:

  • Temporary stairways, (b)(1). At least 24 inches wide, with a landing at each floor or level at least 30 inches in the direction of travel, and landings at least 24 inches wide at every 12 feet or less of vertical rise.
  • Angle, (b)(2). Stairs installed between 30 and 50 degrees from horizontal.
  • Uniformity, (b)(3). Riser height and tread depth uniform within each flight, with variation not exceeding 1/4 inch on any stairway.
  • Doors and gates, (b)(4). Where a door or gate opens directly onto a stairway, a platform is required, and the swing may not reduce its effective width below 20 inches.
  • Landings, (b)(5) through (b)(8). Unprotected sides and edges of landings need railings under §1620, metal pan landings and treads must be secured before fill is placed, parts must be free of hazardous projections such as protruding nails, and slippery conditions must be eliminated before the stairway is used to reach another level.

Stair Rails and Handrails

Section 1626(c)(1) applies to stairways having four or more risers or rising more than 30 inches, whichever is less. Those stairways need at least one handrail, and each unprotected side or edge needs a stair rail with a top rail and mid-rail. The measurements that matter:

  • Stair rail height of 34 to 38 inches, measured from the upper surface of the rail to the surface of the tread in line with the face of the riser at the forward edge of the tread, under §1626(c)(3).
  • Mid-rails located midway between the top rail and the steps under §1626(c)(4). Screens or mesh used instead must extend from the top rail to the step, and other structural members must leave no opening over 18 inches.
  • Handrails and top rails capable of withstanding at least 200 pounds applied within 2 inches of the top edge, in any downward or outward direction, under §1626(c)(5).
  • Handrail height of 34 to 38 inches under §1626(c)(6), and the same range under (c)(7) where a stair rail’s top edge also serves as the handrail.
  • Temporary handrails with at least 3 inches of clearance from walls, stair rails, and other objects under §1626(c)(11).

The section also requires rails surfaced to prevent punctures, lacerations, and snagging of clothing, an adequate handhold, and rail ends that do not present a projection hazard. A defect I see in jobsite audits is a single 2×4 nailed to the stringers with no mid-rail on an open side.

Pan Stairs and Skeleton Stairs

Metal stairs often go in before their treads are filled, and §1626(d) controls how they may be used in that state. Except during stairway construction, foot traffic is prohibited on pan stairs whose treads or landings are to be filled later, unless they are temporarily fitted with solid material at least to the top edge of each pan, under §1626(d)(1). Skeleton metal stairs awaiting permanent treads may not be walked on unless secured temporary treads and landings cover the entire tread and landing area, under §1626(d)(2). Temporary treads must be wood or other solid material, cover the full width and depth, and be supported against undue deflection, under §1626(d)(3), and must be replaced when worn below the top edge of the pan, under §1626(d)(4).

Ladders as Access

Where §1629 allows ladders, §1629(c) adds limits. Single cleat ladders shall not exceed 30 feet. Double cleat ladders are required where ladders are the primary means of access or exit for a working area of 25 or more employees, or where simultaneous two-way traffic is expected, and they shall not exceed 24 feet. Side rails of all ladders must extend at least 3 feet above the landing or level served.

Section 1629(c)(4) sends ladder use to Article 25. Section 1675(b) in that article requires portable ladders in construction to comply with General Industry Safety Order §3276, and §1675(d) prohibits single-rail ladders. Among the §3276 rules, (e)(9) calls for a horizontal distance from the top support to the foot of one-quarter of the working length where possible, and (f) requires employee training before ladder use.

What to Do This Week

  1. Measure the building against the §1629(a)(1) and (a)(4) triggers and confirm you have the required number of stairways.
  2. Walk every stairway and clear stored material from landings and treads.
  3. Check rail heights, mid-rails, and the 200-pound capacity on every open side.
  4. Close off pan and skeleton stairs that lack temporary treads.
  5. Check job-built ladders against the 30-foot and 24-foot limits and the 3-foot side rail extension.

A site safety audit will check access against §1626 and §1629 floor by floor, and if a stairway or ladder item has already been cited, review the Cal/OSHA citation guide and act inside your appeal window. To request a consultation, call (626) 546-9384.

Need help with a Cal/OSHA matter?

McNeil Safety Consulting provides Cal/OSHA citation defense, industrial hygiene, safety plan writing, and expert witness services throughout California. Call (626) 546-9384 or request a consultation.